Tapia WRF Process Air Improvements (On-Demand)
Recorded On: 06/24/2021
-
You must log in to register
- Non-member - $25
- Member - $35
Member fee: $25.00
Non-Member fee: $35.00
1.2 contact hours towards CWEA's Electrical / Instrumentation Technician, and Mechanical Technologist certifications
To improve energy efficiency and reduce operational costs, the Las Virgenes – Triunfo Joint Power Authority (JPA) with PACE Advanced Water Engineering serving as the engineering consultant, led a process air improvement project at the 12 MGD Tapia Water Reclamation Facility (WRF). The improvements included adding over 60 retrievable, fine bubble aeration grids, three 400HP magnetic-bearing turbine blowers, converting 4160 medium voltage electrical gear down to 480V, and SCADA/controls integration to optimize process controls. These improvements reduced energy consumption by almost 40%. Additionally, the JPA used a specialized equipment procurement process known as Performance-Based Specifications during the design phase yielding a capital cost savings of 30%. As a result, the community benefits from a reasonable capital expense outlay with a return on investment of less than six years, with an estimated $2.5M savings over the new system’s 20-year expected life.

John Zhao, PE
Director of Facilities and Operations
Las Virgenes Municipal Water District
John Zhao has been with the Las Virgenes Municipal Water District for the last 15 years. He served as a Principal Engineer and currently as the Director of Facilities and Operations to provide wastewater treatment and recycled water Distribution, Potable water treatment and distribution, and composting operations to approximately 90,000 people in western Los Angeles County and eastern Ventura County.

Duong Do, PE
Vice President
Environmental Water
Duong Do is a technical expert in civil and environmental engineering with experience spanning back to 1996. As a Vice-President of the Environmental Water Division, his current responsibilities include managing the design and engineering of water and wastewater treatment, storage, and conveyance projects. Mr. Do has served as the Engineer-of-Record and Project Manager for numerous wastewater treatment projects throughout the Southwestern U.S., including several award-winning facilities.
To receive your contact hours for viewing the live webinar, please note different attention check code(s) that will be displayed at two different points during the webinar in the top left or right corner of the presentation for approximately 90 seconds. Please enter these codes as in the Attention Check Code component under the "Contents" tab.
Please note, all user activity of CWEA certification holders on the Online Wastewater Education Network is subject to the CWEA Code of Ethics standards for professional conduct and ethics. Certification holders should receive credit for a training only once within the same contact hour period. Any attempt to undermine the certification process may be subject to ethics procedures and possible sanctions. It is not possible to receive contact hours for both attending the live webinar and viewing the recording.
Once you have entered the correct attendance check codes, you will be able to create and download an electronic certificate of completion under the "Contents" tab.
Key:




